000 01966nmc a2200205 4500
005 20260520005600.0
008 260224s2001 xxu ing
041 _aInglés
100 1 _aCaicedo, Sergio
_95768
111 2 _aLatin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
_95738
245 0 0 _aEstimating IPR Curves in Intermittent Gas Lift Wells From Standard Production Tests
_bSPE 69403
260 _aDallas, Texas
_bSociety of Petroleum Engineers
_c2001
270 _a12/09/06 ; 17/07/01
520 _aCurrently in Lake Maracaibo there are nearly 2000 wells on Intermittent Gas Lift (IGL) with an average production of 150 BPD, so a method to estimate the IPR curves in such wells is necessary and important. Considering that in IGL the bottom hole flowing pressure is an instantaneous value continuously changing, then the correct and precise way to determine the IPR curve is through a production test along with a downhole pressure survey. However, many times this method is not economically convenient in highly depleted wells, as it does in a typical intermittent gas lift well. Since there is no publication reported on this subject, the purpose of this work is to get the equations that relate Vogel's model with field data for IGL wells and a numerical method to solve these equations in order to obtain an IPR estimation. Through these equations more realistic values can be obtained, and therefore a better match can be reached between simulators' outputs and field data. These equations will help the field engineer to properly analyze and design these types of wells.
711 2 _aLatin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina)
800 1 _aCaicedo, Sergio
_95768
856 _uhttps://biblioteca.iapg.org.ar/ArchivosAdjuntos/LACPEC2001/Spe69403.pdf
942 _cCONGTP
999 _c130847
_d130847