| 000 | 00873nam a2200277 4500 | ||
|---|---|---|---|
| 001 | 0011796 | ||
| 005 | 20260608202451.0 | ||
| 008 | 260224s1992 xxu | ||
| 020 | _a0884150119 | ||
| 082 | _a622.338.1 L311 0011796 | ||
| 245 | 0 | 0 | _aFormulas and calculations for drilling, production and workover |
| 260 |
_aHouston, Texas _bGulf Publishing _c1992 |
||
| 270 | _a16/09/2025 ; 03/08/06 | ||
| 300 | _aviii; 216 p. | ||
| 773 | _g | ||
| 942 | _cLIBRO | ||
| 100 | 1 |
_aLapeyrouse, Norton J. _94208 |
|
| 650 | 0 |
_aPerforación de pozos _938 |
|
| 650 | 0 |
_aTerminación de pozos _9327 |
|
| 650 | 0 |
_aInyección en perforación _92234 |
|
| 650 | 0 |
_aControl de presión _94209 |
|
| 650 | 0 |
_aHidráulica de la perforación _9275 |
|
| 650 | 0 |
_aWorkover _94210 |
|
| 800 | 1 |
_aLapeyrouse, Norton J. _94208 |
|
| 999 |
_c129880 _d129880 |
||