Image from Google Jackets

Full-scale test rig validates benefits of electric BOP

By: Language: Inglés Publication details: ago. 2025Description: 4 p In: World Oil
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200070047

The development of a fully electric subsea blowout preventer significantly improves BOP reliability and performance while reducing weight, wellhead fatigue, emergency disconnect times and OPEX. The full-scale testing of electric shear ram actuators on an 18¾-in BOP at HMH’s electrification lab validates the achievement of such benefits.

8



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales