More than the sum of its part How 20000-psi subsea BOP stack was designed, developed
Publication details: mayo 2009Description: 4 p. ; 76-79 In: Drilling Contractor 82| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200047295 |
5



