A difficult HPHT well drilled using real-time ECD modeling, diagnosis
Publication details: mar. 2010Description: 7 p. ; 37-43 In: World Oil 231| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200046737 |
Drilling experience with a small pressure window demonstrated the usefulness of ECD control and early kick detection
3



