Image from Google Jackets

Germany's largest oil field mittelplate A unique field development challenge in an environmentally sensitive area

By: Series: Rappuhn, Thomas ; Description: 5 pDDC classification:
  • CD W938 1 0013960
In: Summary: Resumen del autor, extraído del trabajo. This poster session outlines field development management where new technologies such as ERD are used. An ERD project from an onshore location was started to increase production in addition to available production volumes from an artificial island. In summer 1998 the first Extended Reach well was completed successfully. Until December 1999 three wells were drilled from the onshore location.
Item type: Congresos (trabajos presentados)
Holdings
Current library Call number Status Barcode
Biblioteca Alejandro Angel Bulgheroni CD W938 1 0013960 (Browse shelf(Opens below)) Not for loan 200006354

Resumen del autor, extraído del trabajo. This poster session outlines field development management where new technologies such as ERD are used. An ERD project from an onshore location was started to increase production in addition to available production volumes from an artificial island. In summer 1998 the first Extended Reach well was completed successfully. Until December 1999 three wells were drilled from the onshore location.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales