<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>01507nab a2200205   4500</leader>
  <controlfield tag="005">20260520001149.0</controlfield>
  <controlfield tag="008">260224s2020    xxu                 ing  </controlfield>
  <datafield tag="041" ind1=" " ind2=" ">
    <subfield code="a">Ingl&#xE9;s</subfield>
  </datafield>
  <datafield tag="245" ind1="0" ind2="0">
    <subfield code="a">Optimizing flow measurement accuracy to reduce costs</subfield>
    <subfield code="b">Smart flow conditioning projects pay for themselves.</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a"></subfield>
    <subfield code="b"></subfield>
    <subfield code="c">nov. 2020</subfield>
  </datafield>
  <datafield tag="270" ind1=" " ind2=" ">
    <subfield code="a">10/03/2021 ; 08/03/2021</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">[c.a.] 6 p.</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">Plant projects that optimize flow measurement accuracy can result in significant cost savings while offering quality improvements and even a competitive advantage. The accurate measurement of gases, steam, liquids and slurries is critically important in oil and gas production, pipelines, refineries and many other types of petrochemical plants. Unfortunately, the measurement of flow is often an afterthought&amp;#x97;especially in many plant expansions, equipment upgrades and retrofit projects. The selection and placement of flow switches and flowmeters requires careful advance thought. Choosing the wrong flow sensing technology for an application or placing the flow instrument in the wrong location too closely to pumps or valves can eliminate potential cost savings and it frequently results in unnecessary replacement or relocation projects.</subfield>
  </datafield>
  <datafield tag="581" ind1=" " ind2=" ">
    <subfield code="a">11</subfield>
  </datafield>
  <datafield tag="773" ind1="0" ind2=" ">
    <subfield code="t">E &amp; P</subfield>
    <subfield code="g"></subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="c">ARTICULO</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Lundberg, Don</subfield>
    <subfield code="9">59965</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">193860</subfield>
    <subfield code="d">193860</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="u">https://epplus.hartenergy.com/issue/november-2020/optimizing-flow-measurement-accuracy-to-reduce-costs/</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="9">261579</subfield>
    <subfield code="a">BVIAPG</subfield>
    <subfield code="b">BVIAPG</subfield>
    <subfield code="d">2026-03-06</subfield>
    <subfield code="j">200066225</subfield>
    <subfield code="l">0</subfield>
    <subfield code="p">200066225</subfield>
    <subfield code="r">2026-03-06 00:38:48</subfield>
    <subfield code="w">2026-03-06</subfield>
    <subfield code="y">ARTICULO</subfield>
  </datafield>
</record>
