<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>01562nab a2200205   4500</leader>
  <controlfield tag="005">20260520001148.0</controlfield>
  <controlfield tag="008">260224s2021    xxu                 ing  </controlfield>
  <datafield tag="041" ind1=" " ind2=" ">
    <subfield code="a">Ingl&#xE9;s</subfield>
  </datafield>
  <datafield tag="245" ind1="0" ind2="0">
    <subfield code="a">Providing crucial data visibility</subfield>
    <subfield code="b">New software integrates engineering planning with geoscience data for optimal well path designs.</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a"></subfield>
    <subfield code="b"></subfield>
    <subfield code="c">ene. 2021</subfield>
  </datafield>
  <datafield tag="270" ind1=" " ind2=" ">
    <subfield code="a">10/03/2021 ; 05/03/2021</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">[c.a.] 3 p.</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">Expert knowledge resides in individuals, but data belong to everyone. The petroleum industry is adopting a more integrated team approach to well planning and drilling, with software technology bringing engineering and geoscience closer together for better well trajectory designs. The ability to integrate all available geological and geophysical (G&amp;G) data and related interpretations, and also identify the locations and paths of planned and existing wells, optimizes well planning in unconventional and fractured reservoirs. A collaborative team of technical experts with access to all relevant data can provide benefits in terms of safety, efficiency and delivery cycle times, and help maximize the project&amp;#x92;s return on investment. Software advances that support the integration of engineering planning and geoscience data will assist these new collaborative teams to function effectively.</subfield>
  </datafield>
  <datafield tag="581" ind1=" " ind2=" ">
    <subfield code="a">1</subfield>
  </datafield>
  <datafield tag="773" ind1="0" ind2=" ">
    <subfield code="t">E &amp; P</subfield>
    <subfield code="g"></subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="c">ARTICULO</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Dominguez, Joe</subfield>
    <subfield code="9">59943</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">193835</subfield>
    <subfield code="d">193835</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="u">https://epplus.hartenergy.com/issue/january-2021/providing-crucial-data-visibility/</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="9">261554</subfield>
    <subfield code="a">BVIAPG</subfield>
    <subfield code="b">BVIAPG</subfield>
    <subfield code="d">2026-03-06</subfield>
    <subfield code="j">200066200</subfield>
    <subfield code="l">0</subfield>
    <subfield code="p">200066200</subfield>
    <subfield code="r">2026-03-06 00:38:47</subfield>
    <subfield code="w">2026-03-06</subfield>
    <subfield code="y">ARTICULO</subfield>
  </datafield>
</record>
