<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02364nmc a2200217   4500</leader>
  <controlfield tag="005">20260521175326.0</controlfield>
  <controlfield tag="008">260224s        xxu                      </controlfield>
  <datafield tag="082" ind1=" " ind2=" ">
    <subfield code="a">PD I116 1 0015668</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Martinez, Eduardo</subfield>
    <subfield code="9">2876</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Espina, Cristian</subfield>
    <subfield code="9">45297</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Alvarez, Diego</subfield>
    <subfield code="9">35459</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
    <subfield code="a">Lopez Pese, Guillermo</subfield>
    <subfield code="9">57996</subfield>
  </datafield>
  <datafield tag="111" ind1="2" ind2=" ">
    <subfield code="a">Congreso Latinoamericano y del Caribe de Perforaci&#xF3;n, Terminaci&#xF3;n, Reparaci&#xF3;n y Servicio de Pozos (3ro. : 2017 sept. 25-28 : Buenos Aires)</subfield>
    <subfield code="9">57483</subfield>
  </datafield>
  <datafield tag="245" ind1="0" ind2="0">
    <subfield code="a">PINPOINT COMPLETION TECHNOLOGY IN THE VACA MUERTA SHALE: A CASE STUDY</subfield>
  </datafield>
  <datafield tag="270" ind1=" " ind2=" ">
    <subfield code="a">5/6/2019 ; 11/10/2018</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">23 p.</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">The development of unconventional resources has had a tumultuous and disruptive influence on global energy markets. The excitement and promise of previously untapped and unrecognized resources has led the energy industry to often rely upon the "tried-and-true" methods that brought unconventional production to the forefront in north America, in hopes that similar results could be achieved in other basins around the globe. In many cases, proving the economic viability of a new play is considered "good enough" with optimization of the resource recovery left for some future date. The presented case study will document one operator's early steps towards well and reservoir performance optimization through the application of pinpoint completion technology in the Vaca Muerta shale. The resulting impacts on well completion costs, field operations, logistics, and forecasted ultimate reserve recovery will be presented. Finally, an overview of the theory regarding the impact of stress shadows and potential completion options that are entirely unique to the pinpoint completion method will be presented. The application of these new methods may hold the potential to redefine the asset values of many of the world's largest untapped hydrocarbon energy reserves. It is crucial that the custodians of those assets are well informed of all the technologies and techniques available to them, and can reach optimized completion designs early in the life of the reservoir, when those impacts are capable of greatest effect.</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="u">https://biblioteca.iapg.org.ar/cgi-bin/koha/opac-retrieve-file.pl?id=abe5d93d4e37260ef296cbf34496228f</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="c">CONGTP</subfield>
    <subfield code="2">ddc</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">192156</subfield>
    <subfield code="d">192156</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="9">259975</subfield>
    <subfield code="a">CDIAPG</subfield>
    <subfield code="b">CDIAPG</subfield>
    <subfield code="c">PD I116 1 0015668</subfield>
    <subfield code="d">2026-03-06</subfield>
    <subfield code="j">200064446</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">PD I116 1 0015668</subfield>
    <subfield code="p">200064446</subfield>
    <subfield code="r">2026-03-06 00:36:11</subfield>
    <subfield code="w">2026-03-06</subfield>
    <subfield code="y">ARCHIVO</subfield>
  </datafield>
</record>
