<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>01624nmc a2200205   4500</leader>
  <controlfield tag="005">20260520005827.0</controlfield>
  <controlfield tag="008">260224s        xxu                      </controlfield>
  <datafield tag="082" ind1=" " ind2=" ">
    <subfield code="a">CD I249 1 0013788</subfield>
  </datafield>
  <datafield tag="245" ind1="0" ind2="0">
    <subfield code="a">Evolution of "asset management" at Badak LPG plant, Bontang Indonesia</subfield>
  </datafield>
  <datafield tag="270" ind1=" " ind2=" ">
    <subfield code="a">07/09/06 ; 22/07/2003</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">11 p.</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Disponible en CD en formato PDF</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">Transcripci&#xF3;n del abstract original del autor: PT Badak is meeting the challenges of the LNG market, by significantly increasing its available spare capacity at the Bontang LNG Plant. To realize its vision, PT Badak formed the inter Departmental Reliability Improvement Team (RIT) in 1996. The team identifies the reliability issues, prioritizes the issues, makes plans for reliability improvement to eliminate each reliability issue, and monitors the implementation of each action plan. The LNG losses due to problems with the Multi Component Refrigerant (MCR) Compressor, gas-treating unit, MCR inter after cooler, and the Cooling water distribution problems (Surface condenser leaks and Scaling problems) have been significantly reduced .As a result, the production increases and up time availability have improved from 90 to over 96 %, a world class level. This paper will attempt to share the lessons PT Badak has learned in improving the reliability strategy of Asset Management.</subfield>
  </datafield>
  <datafield tag="773" ind1=" " ind2=" ">
    <subfield code="g"></subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="c">CONGTP</subfield>
  </datafield>
  <datafield tag="110" ind1="2" ind2=" ">
    <subfield code="a">International Gas Union, IGU</subfield>
    <subfield code="9">13105</subfield>
  </datafield>
  <datafield tag="111" ind1="2" ind2=" ">
    <subfield code="a">World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)</subfield>
    <subfield code="9">22029</subfield>
  </datafield>
  <datafield tag="710" ind1="2" ind2=" ">
    <subfield code="a">International Gas Union, IGU</subfield>
    <subfield code="9">13105</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">149876</subfield>
    <subfield code="d">149876</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="9">217695</subfield>
    <subfield code="a">BAAB</subfield>
    <subfield code="b">BAAB</subfield>
    <subfield code="c">CD I249 1 0013788</subfield>
    <subfield code="d">2026-03-04</subfield>
    <subfield code="j">200025876</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">CD I249 1 0013788</subfield>
    <subfield code="p">200025876</subfield>
    <subfield code="r">2026-03-04 16:39:04</subfield>
    <subfield code="w">2026-03-04</subfield>
    <subfield code="y">ARCHIVO</subfield>
  </datafield>
</record>
