TY - DATA AU - Zurita,D.N. AU - Abella,F.J. AU - Luongo,S. AU - Maino,J.C. AU - Montenegro,E.M. AU - Panza,L.A. AU - Lopez,R.E. AU - Sequra,H.R. AU - Romero,V.M. AU - Gómez Cavieres,G.E. AU - Homes,A.H. AU - Romero,E.O. AU - Abella,F.J. AU - Luongo,S. AU - Maino,J.C. AU - Montenegro,E.M. AU - Panza,L.A. AU - Lopez,R.E. AU - Sequra,H.R. AU - Romero,V.M. AU - Gómez Cavieres,G.E. AU - Homes,A.H. AU - Romero,E.O. ED - Latin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina) ED - Latin American and Caribbean Petroleum Engineering Conference (7th : 2001 mar. 25-28 : Buenos Aires, Argentina) TI - Use of Coiled-Tubing on Production Wells Located in the San Jorge Basin: SPE 69409 PY - 2001/// CY - Dallas, Texas PB - Society of Petroleum Engineers N2 - In the continuous search of the optimization of investments and the reduction of operative costs, Repsol-YPF decided to research the possibility of the use of Coiled Tubing to produce traditional diameter wells at the Golfo San Jorge Basin. This represents a further step after an experience undertaken in reduced diameters started in 1997 1 . Through this new experience it was proven that it is posible to produce wells with diameters higher than 3.5 in. Using coiled tubing in mechanical pumping, generating at the same time new possiblilities for coiled tubing with other artificial lift systems UR - https://biblioteca.iapg.org.ar/ArchivosAdjuntos/LACPEC2001/Spe69409.pdf ER -