Online resources: In: Summary: In one of Chubutś main secondary recovery project, with great impact on production and reserves in El Trébol field, Proved Developed on Production Reserves suffered a strong discount. A multidisciplinary team was formed that made a diagnosis based on Monitoring and Surveillance techniques and proposed a short, medium and long term development plan. The first phase consisted in an immediate action plan to reverse the projectś strong decline rate and shield reserves, with low associated investment. In a second phase, actions were planned at a well-pattern level and 40 infill wells were drilled. In the third phase, the previous results were analyzed and the static model was revisited, a new calculation of OOIP was made. In this last phase, 34 more wells were drilled, which enabled an increase in recovery factors of the main blocks in the project. These actions not only avoided the loss of production, but also allowed an increase in EUR, an incorporation of reserves, and a future development plan for the field was defined. Instantaneous flow rate of oil increased by 33% at its maximum peak. Pushing the recovery factor in an asset in which development began in 1938 was not challenge free, it took several years of sustained commitment and multidisciplinary team work. In this paper workflow and results will be presented.
Item type: Congresos (trabajos presentados) List(s) this item appears in: Conexplo 2022
Holdings
Current library Call number Status Barcode
Biblioteca virtual 068.82 553.28 C62 15730 (Browse shelf(Opens below)) Not for loan 200068592

In one of Chubutś main secondary recovery project, with great impact on production and reserves in El Trébol field, Proved Developed on Production Reserves suffered a strong discount. A multidisciplinary team was formed that made a diagnosis based on Monitoring and Surveillance techniques and proposed a short, medium and long term development plan. The first phase consisted in an immediate action plan to reverse the projectś strong decline rate and shield reserves, with low associated investment. In a second phase, actions were planned at a well-pattern level and 40 infill wells were drilled. In the third phase, the previous results were analyzed and the static model was revisited, a new calculation of OOIP was made. In this last phase, 34 more wells were drilled, which enabled an increase in recovery factors of the main blocks in the project. These actions not only avoided the loss of production, but also allowed an increase in EUR, an incorporation of reserves, and a future development plan for the field was defined. Instantaneous flow rate of oil increased by 33% at its maximum peak. Pushing the recovery factor in an asset in which development began in 1938 was not challenge free, it took several years of sustained commitment and multidisciplinary team work. In this paper workflow and results will be presented.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales