Image from Google Jackets

Commissioning and startup Increase certainty through advanced planning

By: Language: Inglés Publication details: nov. 2018Description: 4 p. ; 41-45 In: Chemical Engineering
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200064755

Taking commissioning and startup into consideration during the early design phase can result in more predictable project schedules and more robust equipment designs.

11



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales