Image from Google Jackets

Template sails for Åsgard

By: Language: Inglés Publication details: sept. 2013Description: 2 p. ; 20-22 In: Petroleum Review 67
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200060443

At the end of June, after two decades of R&D, the 1,700-tonne manifold base for the world’s first subsea compression station was towed from a shipyard at Egersund, on the Norwegian coast, and lowered carefully to the seabed. Installation will continue during 2014, when two dozen process modules will be assembled onto this base with the aid of specially developed handling equipment. If all goes well, the vast 4,800-tonne Åsgard subsea compression station will start-up in early 2015.

800



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales