Image from Google Jackets

First UBO in Norway incorporates innovative cement design, detailed operational planning

Description: 4 pSubject(s): In: Drilling Contractor Vol. 62, no. 4 (jul./agos. 2006) ; p. 20-25Summary: Gullfaks field project manages bottomhole pressures by choking the return flow.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200039980

Gullfaks field project manages bottomhole pressures by choking the return flow.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales