Choose the right estimating method Pilot plant cost estimating
Description: 6 pSubject(s): In: Chemical Engineering Vol. 112, no. 13 (dic. 2005) ; p. 42-47Summary: The similarity method should be used with caution, as Part 1 of this series emphasized last month. Here are the procedures - as well as the pluses and minuses - for other major ways to get at the capital costs of pilot facilities.| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200038807 |
The similarity method should be used with caution, as Part 1 of this series emphasized last month. Here are the procedures - as well as the pluses and minuses - for other major ways to get at the capital costs of pilot facilities.



