Image from Google Jackets

Advanced logging diagnosis allows successful water shut-off

By: Contributor(s): Description: 3 pSubject(s): In: World Oil Vol. 226, no. 11 (nov. 2005) ; p. 33-35Summary: High resolution production logging data confirmed that setting a plug between sands would solve the problem. Well production went from 650-bpd oil with 5,000-bpd water to about 850-bpd dry oil.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200038371

High resolution production logging data confirmed that setting a plug between sands would solve the problem. Well production went from 650-bpd oil with 5,000-bpd water to about 850-bpd dry oil.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales