Driven by "crisis", rig design is based on parallel operations, aims to change drilling process
Publication details: mayo/jun. 2009Description: 4 p. ; 32-35 In: Drilling Contractor 65| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200047984 |
3



