Image from Google Jackets

Ultra-deepwater well construction relies on 21st century cementing technology

By: Publication details: jun. 2009Description: 2 p. ; 46-47 In: E & P 82Summary: Transcripción del resumen del autor. For the world’s most extreme well construction operations, automated, reliable equipment and engineered fit-for-purpose cement designs are essential.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200047924

Transcripción del resumen del autor. For the world’s most extreme well construction operations, automated, reliable equipment and engineered fit-for-purpose cement designs are essential.

6



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales