An offshore wind farm of Olympic ambition
Publication details: feb. 2010Description: 6 p. ; 36-41 In: Power Engineering International 18Summary: Transcripción del resumen del autor. Last December, London Array Limited signed contracts worth almost €2 billion with seven European suppliers for the supply and installation of the first, 630 MW phase of what will be the world’s biggest wind farm. The Olympic Games will not be the only thing that Londoners will be celebrating when the wind farm becomes operational in 2012.| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200047519 |
Transcripción del resumen del autor. Last December, London Array Limited signed contracts worth almost €2 billion with seven European suppliers for the supply and installation of the first, 630 MW phase of what will be the world’s biggest wind farm. The Olympic Games will not be the only thing that Londoners will be celebrating when the wind farm becomes operational in 2012.
2



