Image from Google Jackets

Managing the costs of new build nuclear power

By: Publication details: mayo 2010Description: 4 p. ; 122-125 In: Power Engineering 18
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200046858

The property and construction consultancy Rider Levett Bucknall has more than 25 years experience of working in the nuclear sector and has recently been appointed to lead the cost management team at Olkiluoto 3 in Finland. Deryck Barton, head of nuclear for Rider Levett Bucknall, talks about the problems and solutions of managing costs for both new and existing nuclear plants and explains how the changing role of the cost consultant is set to alleviate some of the challenges.

5



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales