Image from Google Jackets

In the pipeline

Publication details: nov. 2008Description: 2 p. ; 16;18 In: Petroleum Review 62Summary: Transcripción del resumen del autor. UK environmental, engineering and materials consultancy STATS Ltd* recently completed work in preparation for the construction of a pipeline to supply gas to a new L700mn combined cycle gas turbine (CCGT) power station in Kent
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200051772

Transcripción del resumen del autor. UK environmental, engineering and materials consultancy STATS Ltd* recently completed work in preparation for the construction of a pipeline to supply gas to a new L700mn combined cycle gas turbine (CCGT) power station in Kent

742



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales