Image from Google Jackets

Staged FCCU main fractionator revamp

By: Publication details: oct./nov./dic. 2008Description: 8 p. ; 129-136 In: Petroleum Technology QuarterlySummary: Transcripción del resumen del autor. A refinery column is debottlenecked in steps to address operational concerns and strategic goals. Understanding the site specific operational nuances and developming a representative revamp plan to accommodate the maintenance plan improves the project's success.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200051713

Transcripción del resumen del autor. A refinery column is debottlenecked in steps to address operational concerns and strategic goals. Understanding the site specific operational nuances and developming a representative revamp plan to accommodate the maintenance plan improves the project's success.

4



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales