Image from Google Jackets

Surge in installations bolsters floating production spend

By: Publication details: ene. 2011Description: 3 p. ; 78-81 In: E & P 84Summary: Transcripción del resumen del autor. More than 100 FPSs will be installed worldwide between 2010 and 2014 at a total value of nearly US $45 billion.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200050669

Transcripción del resumen del autor. More than 100 FPSs will be installed worldwide between 2010 and 2014 at a total value of nearly US $45 billion.

1



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales