Image from Google Jackets

EPC contractors selecting an ERP package The goal of any engineer-procure-construct (EPC) arragement is to manage risk, prevent cost overruns, and deliver the project on time. The right enterprise resource planning (ERP) system can help

By: Publication details: mayo 2009Description: 5 p. ; 49-54 In: Chemical Engineering 116
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200044956

5



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales