Subsea tool enables deepwater intervention
Publication details: feb. 2009Description: 2 p. ; 68-69 In: E & P 82Summary: Intervention is necessary to maintain production levels, but when workober rig and vessel day rates are high, the costs can sometimes outweigh the benefits| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200043823 |
Intervention is necessary to maintain production levels, but when workober rig and vessel day rates are high, the costs can sometimes outweigh the benefits
2



