Image from Google Jackets

Evolution of "asset management" at Badak LPG plant, Bontang Indonesia

By: Contributor(s): Description: 11 pDDC classification:
  • CD I249 1 0013788
In: Summary: Transcripción del abstract original del autor: PT Badak is meeting the challenges of the LNG market, by significantly increasing its available spare capacity at the Bontang LNG Plant. To realize its vision, PT Badak formed the inter Departmental Reliability Improvement Team (RIT) in 1996. The team identifies the reliability issues, prioritizes the issues, makes plans for reliability improvement to eliminate each reliability issue, and monitors the implementation of each action plan. The LNG losses due to problems with the Multi Component Refrigerant (MCR) Compressor, gas-treating unit, MCR inter after cooler, and the Cooling water distribution problems (Surface condenser leaks and Scaling problems) have been significantly reduced .As a result, the production increases and up time availability have improved from 90 to over 96 %, a world class level. This paper will attempt to share the lessons PT Badak has learned in improving the reliability strategy of Asset Management.
Item type: Congresos (trabajos presentados)
Holdings
Current library Call number Status Barcode
Biblioteca Alejandro Angel Bulgheroni CD I249 1 0013788 (Browse shelf(Opens below)) Not for loan 200025876

Disponible en CD en formato PDF

Transcripción del abstract original del autor: PT Badak is meeting the challenges of the LNG market, by significantly increasing its available spare capacity at the Bontang LNG Plant. To realize its vision, PT Badak formed the inter Departmental Reliability Improvement Team (RIT) in 1996. The team identifies the reliability issues, prioritizes the issues, makes plans for reliability improvement to eliminate each reliability issue, and monitors the implementation of each action plan. The LNG losses due to problems with the Multi Component Refrigerant (MCR) Compressor, gas-treating unit, MCR inter after cooler, and the Cooling water distribution problems (Surface condenser leaks and Scaling problems) have been significantly reduced .As a result, the production increases and up time availability have improved from 90 to over 96 %, a world class level. This paper will attempt to share the lessons PT Badak has learned in improving the reliability strategy of Asset Management.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales