Image from Google Jackets

Personnel's training

By: Contributor(s): Description: 6 pDDC classification:
  • CD I249 1 0013788
In: Summary: Transcripción del abstract original del autor: The total length of the transmission pipeline of Japanese gas companies is now up to 1,500km. Most of transmission pipeline is installed in the dense city area such as location class 3 or 4 as defined ASME B31.8. So it's one of the major objectives for the Japanese gas companies to maintain the safety of the public through PIMS (Pipeline Integrity Management System) . This paper introduces the outlook of transmission pipeline in Japan and personnel's training system of Tokyo Gas co., ltd..
Item type: Congresos (trabajos presentados)

Disponible en CD en formato PDF

Transcripción del abstract original del autor: The total length of the transmission pipeline of Japanese gas companies is now up to 1,500km. Most of transmission pipeline is installed in the dense city area such as location class 3 or 4 as defined ASME B31.8. So it's one of the major objectives for the Japanese gas companies to maintain the safety of the public through PIMS (Pipeline Integrity Management System) . This paper introduces the outlook of transmission pipeline in Japan and personnel's training system of Tokyo Gas co., ltd..



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales