Image from Google Jackets

Proactive fluids management makes tough directional well possible A Gulf of Mexico operator chose to test HT/HP reservoir from an adjacent-block platform, requiring synthetic mud for high-angle and depleted-zone problems. Special program to monitor pressure, viscosity and real-time hydraulics allowed well completion at significant savings

By: Contributor(s): Series: Murphy, Brian ; Description: 7 p In: World Oil Vol. 220, no. 10 (oct. 1999); p. 61-68
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200012861


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales