One-time deployed-dual purpose well completion proves technical and economic success throughout the entire productive life of wells using jet pump and hydraulic piston pump (Record no. 191547)

MARC details
000 -LEADER
fixed length control field 02671nmc a2200193 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación PD I116 1 0015668
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Nuñez-Pino, Osman A.
9 (RLIN) 57583
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Kosmicki, Ron
9 (RLIN) 57584
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso Congreso Latinoamericano y del Caribe de Perforación, Terminación, Reparación y Servicio de Pozos (3ro. : 2017 sept. 25-28 : Buenos Aires)
9 (RLIN) 57483
245 00 - TITULO
Título One-time deployed-dual purpose well completion proves technical and economic success throughout the entire productive life of wells using jet pump and hydraulic piston pump
270 ## - FECHA DE CARGA
Fecha de carga 5/6/2019 ; 08/11/2017
300 ## - DESCRIPCION FISICA
Otra extensión 11 p.
520 ## - RESUMEN, ETC
Resumen A single-time deployed, multi-purpose well completion can be designed and installed to successfully produce certain particular wells, from the time of their initial clean-up stage all the way to their reservoir depletion. This ingenious and particular type of downhole configuration offers the advantage of producing medium to high rates at considerably high flowing pressures using a hydraulic jet pump, to lately accept a hydraulic piston pump, which will produce relatively low flow rates at very low producing pressures, with absolutely no modifications to the original completion. When properly engineered, either a jet pump or a piston pump can perfectly work in the same downhole bottom-hole assembly (BHA), as well as be circulated in and out of the well. As consequence of this important flexibility, operational expenses related to well repairs are literally taken out of the equation, only one work-over job is needed, at the very beginning of the well' artificially lifted stage. Initially, the jet pump will effectively clean-up the well and produce medium to high rates, then when producing pressures are substantially lower, the jet pump is circulated out from the well, and a piston pump is immediately installed ("dropped" using the same tubing completion to continue producing the well down the road. Again, a work-over job is not required to carry on with this lifting method transition. This hydraulic jet - piston pump dual completion approach has proved to reduce significantly well repair expenses as well as nonproductive times during pump retrievals. The technical knowledge provided in this paper will help oilfield operators on the well selection, planning, completion design, installation and operation of this simple but highly effective advantageous completion configuration.
856 ## - LINK
Link <a href="https://biblioteca.iapg.org.ar/cgi-bin/koha/opac-retrieve-file.pl?id=78fd56e9f0279d0ccdf2476c1d9fb1d5">https://biblioteca.iapg.org.ar/cgi-bin/koha/opac-retrieve-file.pl?id=78fd56e9f0279d0ccdf2476c1d9fb1d5</a>
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
Fuente de clasificación Dewey Decimal Classification
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Colección Digital IAPG Colección Digital IAPG PD I116 1 0015668 06/03/2026 200063826   PD I116 1 0015668 200063826 06/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales