Methods To Obtain Quick Estimates of Formation Parameters in Interference Tests Derived From Features of the Line-Source Solution--Theory and Application (Record no. 187581)

MARC details
000 -LEADER
fixed length control field 02088nab a2200193 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s2013 xxu ing
041 ## - IDIOMA
Idioma Inglés
245 00 - TITULO
Título Methods To Obtain Quick Estimates of Formation Parameters in Interference Tests Derived From Features of the Line-Source Solution--Theory and Application
260 ## - PUBLICACION, DISTRIBUCION, ETC
Lugar de publicación, distribución, etc.
Nombre de publicador, distribuidor, etc.
Fecha de publicación, distribución, etc. feb. 2013
270 ## - FECHA DE CARGA
Fecha de carga 09/04/2013 ; 09/04/2013
300 ## - DESCRIPCION FISICA
Otra extensión 10 p. ; 29-39
520 ## - RESUMEN, ETC
Resumen Transcripción del resumen del autor: Interference testing is the oldest, but still the most effective, way of establishing communication between wells and determining the interwell-reservoir transmissibility. Yet these tests are not run frequently because often the results are difficult to analyze as a result of unforeseen complications. This paper presents practical methods derived from the properties of the line-source solution that is used to design and interpret effective interference tests. In single-well transient tests, earlytime features of the exponential integral function occur too early to be observed. However, these features appear much later in an interference test and can be used in an observation well to estimate the storativity and transmissibility ratios of the reservoir. The pressure response and the log derivative of the pressure intersect on the log-log diagnostic plot, and the pressure response itself exhibits an inflection point. With these characteristics, simple geometrical methods are proposed to estimate reservoir parameters. Moreover, a new expression of the "lag time," or delay in the response, is formulated. The particular case of falloff or buildup is studied in detail, because the time lag in the reservoir response can bring extra information. A field example is included to demonstrate the application of these methods to actual data and their usefulness to a practicing well-test engineer.
581 ## - ESTADO DE COLECCIÓN
Estado de colección 1
773 0# - CORRECCIÓN
Título SPE Reservoir Evaluation and Engineering
Partes relacionadas 16
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Artículo de Revista
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Maizeret, Pierre-David
9 (RLIN) 52964
Holdings
Biblioteca propietaria Biblioteca actual Fecha de adquisición Inventario Total de préstamos Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni 06/03/2026 200059713   200059713 06/03/2026 Artículo de Revista


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales