Estimating in-place volume and reservoir connectivity with real-time and peridic surveillance data (Record no. 186978)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02230nab a2200205 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s2011 xxu |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Kabir, C. S. |
| 9 (RLIN) | 15994 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Ismandi, D. |
| 9 (RLIN) | 52319 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Fountain, S. |
| 9 (RLIN) | 52320 |
| 245 00 - TITULO | |
| Título | Estimating in-place volume and reservoir connectivity with real-time and peridic surveillance data |
| 260 ## - PUBLICACION, DISTRIBUCION, ETC | |
| Fecha de publicación, distribución, etc. | agos. 2011 |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 03/04/2012 ; 03/04/2012 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 9 p. ; 258 - 266 |
| 520 ## - RESUMEN, ETC | |
| Resumen | Transcripción del resumen del autor. This paper demonstrates the value of collecting and interpreting real-time data. With an intensive data gathering strategy, starting at wells' inception to the mature production phase, we show how transient pressure and rate data can be used to manage a complex carbonate gas reservoir. In particular, reservoir connectivity is discerned with pulse testing and with the leading-edge p/q graph, and continuous updates of in-place volume are made with both static and dynamic material-balance methods and corroborating the same with rate-transient analysis. Interwell connectivity information was deduced during underbalanced drilling by way of interference test between two pairs of wells. Thereafter, transient-pressure tests on individual wells characterized the layered, dual-porosity system, with production logs corroborating the notion of layering. Production maturity over three years has paved the way for estimating connected in-place gas volume associated with each well using the transient-PI, and also with a new method introduced here. This new approach entails plotting both static and dynamic material-balance data on the same graph, yielding the same solution. Errors associated with real-time rate measurements presented interpretation challenges for rate-transient analysis; however, application of a physics-based filtering algorithm resolved this issue. Flow-after-flow tests that were embedded in monthly variable-rate production allocations, in turn, allowed us to obtain average-reservoir pressure explicitly to do the static material-balance analysis. |
| 581 ## - ESTADO DE COLECCIÓN | |
| Estado de colección | 2 |
| 773 0# - CORRECCIÓN | |
| Título | Journal of Petroleum Science & Engineering |
| Partes relacionadas | 78 |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Artículo de Revista |
| Biblioteca propietaria | Biblioteca actual | Fecha de adquisición | Inventario | Total de préstamos | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Biblioteca Alejandro Angel Bulgheroni | 06/03/2026 | 200059083 | 200059083 | 06/03/2026 | Artículo de Revista |



