Risk mitigation in petroleum field development by modular implantation (Record no. 182132)

MARC details
000 -LEADER
fixed length control field 02145nab a2200205 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s2010 xxu
245 00 - TITULO
Título Risk mitigation in petroleum field development by modular implantation
260 ## - PUBLICACION, DISTRIBUCION, ETC
Lugar de publicación, distribución, etc.
Nombre de publicador, distribuidor, etc.
Fecha de publicación, distribución, etc. dic. 2010
270 ## - FECHA DE CARGA
Fecha de carga 30/05/2011 ; 30/05/2011
300 ## - DESCRIPCION FISICA
Otra extensión 8 p. ; 105-113
520 ## - RESUMEN, ETC
Resumen Transcripción del resumen del autor: Risk is always associated to Exploration & Production projects, mainly due to the geological, economic and technological uncertainties. In the development phase, these uncertainties strongly influence the oil recovery. The acquisition of additional information and flexibility are key points to risk mitigation. The value of information quantifies the benefits of new information and flexibility can be added to the project considering various possible scenarios; it offers the opportunity to improve projects by changing decisions in the future. Decision makers can develop giant fields immediately without information and assume the risks or acquire more information and delay the project, adding flexibility to it, such as flexible facilities, intelligent wells and development by modules, which is the focus of this work. A methodology to quantify the risk of a modular implantation of large petroleum fields was proposed. Evaluations of the expected monetary value (EMV), with and without information on possible scenarios, are based on the value of information (VoI). Geological uncertainties are integrated to different production strategies through the geological representative models (GRM). The net present value (NPV) method, supported by the multiattribute utility theory (MAUT), evaluates the return and risk of each possible scenario. The proposed methodology was applied in a case study based on a Brazilian offshore field in order to mitigate the risk associated to its development.
581 ## - ESTADO DE COLECCIÓN
Estado de colección 1-2
773 0# - CORRECCIÓN
Título Journal of Petroleum Science & Engineering
Partes relacionadas 75
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Artículo de Revista
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Hayashi, S.H.D.
9 (RLIN) 50053
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Ligero, E.L.
9 (RLIN) 34106
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Schiozer, D.J.
9 (RLIN) 9519
Holdings
Biblioteca propietaria Biblioteca actual Fecha de adquisición Inventario Total de préstamos Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni 05/03/2026 200054172   200054172 05/03/2026 Artículo de Revista


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales