Optimization in completion wells with a packerless, multistage fracture-stimulation method using CT perforating and annular-path pumping in Argentina (Record no. 174693)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02245nmc a2200205 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s xxu |
| 245 00 - TITULO | |
| Título | Optimization in completion wells with a packerless, multistage fracture-stimulation method using CT perforating and annular-path pumping in Argentina |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 12/04/2011 ; 12/04/2011 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 18 p. |
| 520 ## - RESUMEN, ETC | |
| Resumen | Transcripción del resumen del autor. This paper documents pinpoint fracturing (PPF) in Argentina. The implementation of this method has resulted in 193 fractures in 22 wells since October 2006. The PPF method creates perforations by pumping abrasive slurry down the coiled tubing (CT) through a jetting nozzle, while the main treatment is then pumped down the annulus around the CT. Isolation between fracture treatments is accomplished using sand plugs (preferred method) or composite bridge plugs. This technique has allowed greater selectivity in the stimulation of the areas to be treated; it has also allowed a more aggressive fracture treatment in terms of percent pad and the final proppant concentration because the CT is at the location in case of screen out. In gas fields, it offers the advantage of completing the well without killing it. Different reservoirs with varying depths, temperature, types of fluid, and petrophysical conditions in the basins Golfo San Jorge and Neuquina were stimulated with different fracture fluids, proppant types, and frac gradients. The Neuquina basin required fracturing without using a workover rig in oil and gas fields near the community, while significantly diminishing the working times with a reduction in environmental impact and noise generated during the completion. However, the main goal was the reduction of completion times in each well performed in the different basins of Argentina. |
| 773 ## - CORRECCIÓN | |
| Partes relacionadas | |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Congresos (trabajos presentados) |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Bonapace, Juan Carlos |
| 9 (RLIN) | 45373 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Kovalenko, Federico |
| 9 (RLIN) | 45374 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Canini, Leonardo |
| 9 (RLIN) | 45375 |
| 111 2# - AUTORIDAD DE CONGRESO | |
| Nombre de congreso | Congreso de Producción del Bicentenario (1er. : 2010 mayo 18 al 21 : Salta) |
| 9 (RLIN) | 44754 |
| 856 ## - LINK | |
| Link | <a href="https://biblioteca.iapg.org.ar/ArchivosAdjuntos/CongresoProdBicentenario2010/Optimizationcompletion.pdf">https://biblioteca.iapg.org.ar/ArchivosAdjuntos/CongresoProdBicentenario2010/Optimizationcompletion.pdf</a> |
| Biblioteca propietaria | Biblioteca actual | Fecha de adquisición | Inventario | Total de préstamos | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|
| Colección Digital IAPG | Colección Digital IAPG | 05/03/2026 | 200052715 | 200052715 | 05/03/2026 | Archivo electrónico |



