Injector-well completion design for selectively waterflooding up to 8 zones in multilayered reservoir: experiences in the Cerro Dragon Field (Record no. 165885)

MARC details
000 -LEADER
fixed length control field 02271nam a2200241 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD I116 43 0014775
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Baldassa, Dario
9 (RLIN) 37250
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Giosa, Emilio
9 (RLIN) 37251
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Massaglia, Ezequiel
9 (RLIN) 37252
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso Congreso de Producción (3er : 2006 sept. 19 al 22 : Mendoza)
9 (RLIN) 37249
245 00 - TITULO
Título Injector-well completion design for selectively waterflooding up to 8 zones in multilayered reservoir: experiences in the Cerro Dragon Field
260 ## - PUBLICACION, DISTRIBUCION, ETC
Nombre de publicador, distribuidor, etc. Instituto Argentino del Petróleo y del Gas, IAPG
270 ## - FECHA DE CARGA
Fecha de carga 14/06/2012 ; 07/12/2006
300 ## - DESCRIPCION FISICA
Otra extensión 20 p.
520 ## - RESUMEN, ETC
Resumen The Cerro Dragón asset, located in Golfo San Jorge Basin, Argentina, has around 30 producing structures; each one containing from 20 to 50 separate, highly heterogeneous, reservoir horizons, from 6 to 30 feet thick. From 2000 to 2005 oil production grew from 48,000 BOEPD to over 116,000 BOEPD, largely due to optimization and expansion of waterflooding projects: water injection rate was increased from 248,000 BWPD (average of 5 reservoirs accessed per injector-well) to 714,000 BWPD (average of 12 reservoirs accessed per injector-well). In an experimental process started in 2000, injector-well completions were designed and tested in several wells. The experience acquired (successes and problems encountered from 401 completions) was used to improve them as well as to develop new ones. Today, this process continues, testing and enhancing new designs to fulfill the needs of the upcoming waterflooding projects. In addition, it contains information about the procedures and technology used to reduce the completion set up cost and to extend its useful life by solving leakage problems without replacing the completion installation. The objective of this paper is to serve as a reference guide for injector-well completion designs in multilayered fields where a vertical expansion of the waterflooding projects is intended.
650 #0 - MATERIA
Término tópico Pozos inyectores
9 (RLIN) 1706
650 #0 - MATERIA
Término tópico Yacimiento Cerro Dragón
9 (RLIN) 5333
856 ## - LINK
Link <a href="https://biblioteca.iapg.org.ar/cgi-bin/koha/opac-retrieve-file.pl?id=392aa6dc389e44e2b53ac729e32f230c">https://biblioteca.iapg.org.ar/cgi-bin/koha/opac-retrieve-file.pl?id=392aa6dc389e44e2b53ac729e32f230c</a>
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Colección Digital IAPG Colección Digital IAPG CD I116 43 0014775 05/03/2026 200040592   CD I116 43 0014775 200040592 05/03/2026 Congresos (trabajos presentados)


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales