Diadema, the first underground storage facility for natural gas in Argentina. Considerations regarding environmental protection, safety and quality (Record no. 149925)

MARC details
000 -LEADER
fixed length control field 02460nmc a2200217 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD I249 1 0013788
245 00 - TITULO
Título Diadema, the first underground storage facility for natural gas in Argentina. Considerations regarding environmental protection, safety and quality
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 22/07/2003
300 ## - DESCRIPCION FISICA
Otra extensión 8 p.
500 ## - NOTAS
Nota general Disponible en CD en formato PDF
520 ## - RESUMEN, ETC
Resumen Transcripción del abstract original del autor: In the most southern part of the American continent, the first underground storage facility for natural gas in Argentina has been recently developed, completing with satisfactory results an injection and production cycle over 2001 and 2002 (Fig. 1). The Diadema underground storage facility, located nearby the city of Comodoro Rivadavia, has been built to partially meet the great demand of gas for domestic and industrial use during winter season in the central and northern areas of the Patagonia, when the oil fields supplying the region with associated gas are unable to comply with gas demand. Consequently, it is necessary to store the gas coming from the gas fields located in the Tierra del Fuego island during summer and to retrieve it during winter for local distribution. REPSOL YPF took the initiative to develop with Géostock technical support this commercial project, consisting in the conversion of a depleted gas field by refurbishing old production wells, drilling new wells and installing surface equipment, using the most modern technology and complying with drastic conditions regarding safety, quality and environmental protection. This project has successfully completed the process of obtaining the Certification of an Integrated Management System. This paper presents the main geological features of the Diadema facility, points out the studies related to reservoir modelling and simulation, describes the surface and subsurface equipment at present in operation and those planned for future expansions, and indicates the operational aspects in relation to gas movements and monitoring implemented for environmental protection.
773 ## - CORRECCIÓN
Partes relacionadas
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Rodriguez, Juan José
9 (RLIN) 3424
110 2# - RESPONSABLE INSTITUCIONAL
Responsable Institucional International Gas Union, IGU
9 (RLIN) 13105
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
9 (RLIN) 22029
710 2# - OTRA AUTORIDAD CORPORATIVA
Nombre Institucional International Gas Union, IGU
9 (RLIN) 13105
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni CD I249 1 0013788 04/03/2026 200025926   CD I249 1 0013788 200025926 04/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales