The implementation of an integral pipeline (integrity) management system means more than integrity alone (Record no. 149617)

MARC details
000 -LEADER
fixed length control field 02397nmc a2200241 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD I249 1 0013788
245 00 - TITULO
Título The implementation of an integral pipeline (integrity) management system means more than integrity alone
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 22/07/2003
300 ## - DESCRIPCION FISICA
Otra extensión 12 p.
500 ## - NOTAS
Nota general Disponible en CD en formato PDF
520 ## - RESUMEN, ETC
Resumen Transcripción del abstract original del autor: This paper will give an overview of the history of PiMS and the new developments within Gastransport Services regarding the implementation of an integral Pipeline (integrity) Management System. The authors will discuss the history, objectives, processes and the way how to reach the goal in more detail in this paper. The design of the pipeline network in the Netherlands was based on the ASME B31G guidelines, as a sound engineering practise. The construction started early 1960 in a very rapid tempo. The control and maintenance in those years was executed on a paper based system with steady state frequencies of measurements uniformly distributed all over the network. With the nowadays databases and computer systems all kind of analyses beyond the capacity of a pipeline engineer can be carried out. These analyses have been made possible by outstanding. Research of different companies, Joint Industry Programs and international investigations executed by a variety of different well known groups. However an integration of all the data and stand-alone models into one single (PiMS-)system with one or more linked databases and controlled by one process control system was not a major option due to a lack of IT-possibilities and management objectives. Due to very fast developments in IT, recent incidents in the industry all over the world, the change in management objectives to have a faster and a better control over the pipeline safety, reliability and associating costs a strong desire for a PiMS-process control system was born.
773 ## - CORRECCIÓN
Partes relacionadas
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Hordijk, A. Pijnacker
9 (RLIN) 22224
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Kornalijnslijper, M.
9 (RLIN) 22225
110 2# - RESPONSABLE INSTITUCIONAL
Responsable Institucional International Gas Union, IGU
9 (RLIN) 13105
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
9 (RLIN) 22029
700 1# - OTRA AUTORIDAD PERSONAL
Nombre Kornalijnslijper, M.
9 (RLIN) 22225
710 2# - OTRA AUTORIDAD CORPORATIVA
Nombre Institucional International Gas Union, IGU
9 (RLIN) 13105
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni CD I249 1 0013788 04/03/2026 200025610   CD I249 1 0013788 200025610 04/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales