Blue stream ready for gas transportation (Record no. 149521)

MARC details
000 -LEADER
fixed length control field 02126nmc a2200205 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD I249 1 0013788
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Caruso, Salvatore
9 (RLIN) 22131
110 2# - RESPONSABLE INSTITUCIONAL
Responsable Institucional International Gas Union, IGU
9 (RLIN) 13105
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo)
9 (RLIN) 22029
245 00 - TITULO
Título Blue stream ready for gas transportation
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 22/07/2003
300 ## - DESCRIPCION FISICA
Otra extensión 16 p.
500 ## - NOTAS
Nota general Disponible en CD en formato PDF
520 ## - RESUMEN, ETC
Resumen Transcripción del abstract original del autor: This paper presents and details the Blue Stream project through the various phases for the section managed by BSPC (Blue Stream Pipeline Company BV), from the very beginning to its conclusion, with deep analyses of main features and characteristics as well as the various challenging matters faced and overcome, opening a new frontier for the laying of pipelines in deep water. The project consists of three main segments: the onshore section in the Russian territory from Stavropol to the Black Sea coast controlled by Gazprom, the section of BSPC to cross the Black Sea and the onshore part in the Turkish territory from Samsun to Ankara managed by Botas. The BSPC part consists respectively of one Compressor Station in Beregovaya close to the Russian coast on the Black Sea and two offshore pipelines of 24" Nominal Diameter at the world's record depth of 2,150 m. The Offshore Section was realised laying the pipelines both with standard S-Lay mode in shallow waters and with the innovative J-Lay method for the main part of the routes. J-Lay was executed through the Saipem 7000 (S7000) vessel, custom modified for the purpose. Various technical difficulties had to be solved, such as the geohazard in the Russian steep slope, the presence of H2S in the seawater and the laying at very deep water. The project is ready for the first gas flow from Russia to Turkish market and the first gas flow occurred at the beginning of year 2002.
710 2# - OTRA AUTORIDAD CORPORATIVA
Nombre Institucional International Gas Union, IGU
9 (RLIN) 13105
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
Fuente de clasificación Dewey Decimal Classification
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni CD I249 1 0013788 04/03/2026 200025514   CD I249 1 0013788 200025514 04/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales