Blue stream ready for gas transportation (Record no. 149521)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02126nmc a2200205 4500 |
| 008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL | |
| Campo de control de longitud fija | 260224s xxu |
| 082 ## - CLASIFICACIÓN DEWEY | |
| Número de clasificación | CD I249 1 0013788 |
| 100 1# - RESPONSABLE PERSONAL | |
| Apellido, Nombre | Caruso, Salvatore |
| 9 (RLIN) | 22131 |
| 110 2# - RESPONSABLE INSTITUCIONAL | |
| Responsable Institucional | International Gas Union, IGU |
| 9 (RLIN) | 13105 |
| 111 2# - AUTORIDAD DE CONGRESO | |
| Nombre de congreso | World Gas Conference (22nd. : 2003 jun 1-5 : Tokyo) |
| 9 (RLIN) | 22029 |
| 245 00 - TITULO | |
| Título | Blue stream ready for gas transportation |
| 270 ## - FECHA DE CARGA | |
| Fecha de carga | 12/09/06 ; 22/07/2003 |
| 300 ## - DESCRIPCION FISICA | |
| Otra extensión | 16 p. |
| 500 ## - NOTAS | |
| Nota general | Disponible en CD en formato PDF |
| 520 ## - RESUMEN, ETC | |
| Resumen | Transcripción del abstract original del autor: This paper presents and details the Blue Stream project through the various phases for the section managed by BSPC (Blue Stream Pipeline Company BV), from the very beginning to its conclusion, with deep analyses of main features and characteristics as well as the various challenging matters faced and overcome, opening a new frontier for the laying of pipelines in deep water. The project consists of three main segments: the onshore section in the Russian territory from Stavropol to the Black Sea coast controlled by Gazprom, the section of BSPC to cross the Black Sea and the onshore part in the Turkish territory from Samsun to Ankara managed by Botas. The BSPC part consists respectively of one Compressor Station in Beregovaya close to the Russian coast on the Black Sea and two offshore pipelines of 24" Nominal Diameter at the world's record depth of 2,150 m. The Offshore Section was realised laying the pipelines both with standard S-Lay mode in shallow waters and with the innovative J-Lay method for the main part of the routes. J-Lay was executed through the Saipem 7000 (S7000) vessel, custom modified for the purpose. Various technical difficulties had to be solved, such as the geohazard in the Russian steep slope, the presence of H2S in the seawater and the laying at very deep water. The project is ready for the first gas flow from Russia to Turkish market and the first gas flow occurred at the beginning of year 2002. |
| 710 2# - OTRA AUTORIDAD CORPORATIVA | |
| Nombre Institucional | International Gas Union, IGU |
| 9 (RLIN) | 13105 |
| 942 ## - DESC. DE MATERIAL | |
| Tipo de item KOHA | Congresos (trabajos presentados) |
| Fuente de clasificación | Dewey Decimal Classification |
| Biblioteca propietaria | Biblioteca actual | Ubicación | Fecha de adquisición | Inventario | Total de préstamos | Signatura topográfica | Inventario | Fecha de carga | Tipo de item KOHA |
|---|---|---|---|---|---|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Biblioteca Alejandro Angel Bulgheroni | CD I249 1 0013788 | 04/03/2026 | 200025514 | CD I249 1 0013788 | 200025514 | 04/03/2026 | Archivo electrónico |