HSE Management activities in the design of industrial plants (Record no. 133704)

MARC details
000 -LEADER
fixed length control field 01941nmc a2200229 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD W938 1 0013960
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Senni, S.
9 (RLIN) 9832
110 2# - RESPONSABLE INSTITUCIONAL
Responsable Institucional Snamprogetti
9 (RLIN) 9751
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso World Petroleum Congress (16th. : 2000 jun. 11-15 : Calgary, Alberta, Canada)
9 (RLIN) 34
210 ## - TITULO ABREVIADO
Título abreviado WPC (16th.)
245 00 - TITULO
Título HSE Management activities in the design of industrial plants
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 26/08/2003
300 ## - DESCRIPCION FISICA
Otra extensión 6 p.
520 ## - RESUMEN, ETC
Resumen Resumen del autor, extraído del trabajo. The decision-making process for the selection of the optimum plant system alternative should by backed up by in-depth analyses which assess the specific problems of the plant under examination and take into account the implications on the area where it is located, thus enabling to obtain a global and unified vision of all the HSE problems. The possibility of managing the HSE aspects of a plant presupposes the setting up of a "safe" plant, whose reliability is maintained in the course of time by means of management and technical processes. To ensure this, however, the first thing we have to do is decide to what extent we want it to be safe, that is, we have to decide on a reference point for the level of safety required for persons, the environment and property. It is only if we can demonstrate that the technical selections we have made guarantee this safety level that we can conclude that the plant has been well designed. The paper aims at highlighting the activities as well as the HSE Management System, to be implemented in the design phase and to be carried out independently of the specific actions of the designers, necessary to have sufficient warranties that the industrial plant is "well designed".
710 2# - OTRA AUTORIDAD CORPORATIVA
Nombre Institucional Snamprogetti
9 (RLIN) 9751
773 ## - CORRECCIÓN
Partes relacionadas v. 5, p. 165
800 1# - RESPONSABLE EDICION
Nombre Senni, S.
9 (RLIN) 9832
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
Fuente de clasificación Dewey Decimal Classification
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni CD W938 1 0013960 04/03/2026 200006234   CD W938 1 0013960 200006234 04/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales