Using Project Management Techniques to deliver best in class drilling performance (Record no. 133438)

MARC details
000 -LEADER
fixed length control field 02363nmc a2200229 4500
008 - CÓDIGOS DE INFORMACIÓN DE LONGITUD FIJA - INFORMACIÓN GENERAL
Campo de control de longitud fija 260224s xxu
082 ## - CLASIFICACIÓN DEWEY
Número de clasificación CD W938 1 0013960
210 ## - TITULO ABREVIADO
Título abreviado WPC (16th.)
245 00 - TITULO
Título Using Project Management Techniques to deliver best in class drilling performance
270 ## - FECHA DE CARGA
Fecha de carga 12/09/06 ; 26/08/2003
300 ## - DESCRIPCION FISICA
Otra extensión 10 p.
520 ## - RESUMEN, ETC
Resumen Resumen del autor, extraido del trabajo. Drilling operations are notorious for suffering from significant over-runs in both cost and schedule. These characteristics are symptomatic of defective project management. BP Amoco has acquired a unique set of project management tools and applied them to their drilling campaigns of 1998 and 1999. The results show that ambitious project schedules can be achieved and where problems occur, recovery is both rapid and effective. Risk assessment is a key thread that runs through, from the high level risks in a conceptual design to the details of day to day execution. It is tightly linked to the process for estimating well times and contingency costs and provides a means of communicating risks to business delivery upwards to management. A correct set of well objectives and basis of design is the foundation of an effective detailed planning phase involving a large team of contractors. Key to the success of planning and execution is the integration of the service suppliers and drilling contractor into a comprehensive planning effort. Standard project management techniques are combined with the structuring of the organisation round delivery of key elements of the well to ensure that a large project team is properly focused on delivering a world class operational target. Detailed planning ensures flawless operation and efficient recovery from setbacks. The rig team is critical to getting the detail right. Rigorous post analysis is essential to ensure that lessons learned, not only about the technical aspects of the well, but also the process, are fed back into the planning of future operations.
773 ## - CORRECCIÓN
Partes relacionadas v. 2, p. 132
942 ## - DESC. DE MATERIAL
Tipo de item KOHA Congresos (trabajos presentados)
100 1# - RESPONSABLE PERSONAL
Apellido, Nombre Thorogood, J.L.
9 (RLIN) 9535
110 2# - RESPONSABLE INSTITUCIONAL
Responsable Institucional BP Amoco Norge
9 (RLIN) 9536
111 2# - AUTORIDAD DE CONGRESO
Nombre de congreso World Petroleum Congress (16th. : 2000 jun. 11-15 : Calgary, Alberta, Canada)
9 (RLIN) 34
710 2# - OTRA AUTORIDAD CORPORATIVA
Nombre Institucional BP Amoco Norge
9 (RLIN) 9536
800 1# - RESPONSABLE EDICION
Nombre Thorogood, J.L.
9 (RLIN) 9535
Holdings
Biblioteca propietaria Biblioteca actual Ubicación Fecha de adquisición Inventario Total de préstamos Signatura topográfica Inventario Fecha de carga Tipo de item KOHA
Biblioteca Alejandro Angel Bulgheroni Biblioteca Alejandro Angel Bulgheroni CD W938 1 0013960 04/03/2026 200005902   CD W938 1 0013960 200005902 04/03/2026 Archivo electrónico


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales