Coke drum design
Stewart, Coby W. Stryk, Aaron M. Presley, Lee
Coke drum design - jul./ago./sep. 2006 - 7 p. ; 63-69
Transcripcíón del resumen del autor. Issues to consider for extending the turnaround schedule of a delayed coking unit. Theory behind coke drum failure is discussed, with detailed solutions centred on drum design and support structures
4
Coke drum design - jul./ago./sep. 2006 - 7 p. ; 63-69
Transcripcíón del resumen del autor. Issues to consider for extending the turnaround schedule of a delayed coking unit. Theory behind coke drum failure is discussed, with detailed solutions centred on drum design and support structures
4



