Successful drilling and completion at BC-10 using surface BOP system The implementation of a seabed isolation device enabled a doubling of the operating water depth capacity for operations offshore Brazil

Tarr, Brian A. Taklo, Tor Hudson, Andrew

Successful drilling and completion at BC-10 using surface BOP system The implementation of a seabed isolation device enabled a doubling of the operating water depth capacity for operations offshore Brazil - abr. 2010 - 11 p. ; 83-93

4


Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales