Permanent P&A performed on coiled tubing, setting rock-to-rock barriers and protecting potable water sources
Language: Inglés Publication details: mar. 2025Description: 4 p In: World Oil| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200070131 |
The Reclaim™ plug and abandonment (P&A) system helped a tier-one operator permanently abandon a well at the end of its economic life. The system facilitated plugging on coiled tubing and ensured full lateral isolation over a 277-ft zone in only two days.
3



