"But what will it cost?"" The keys to success in pilot plant cost estimating
Description: 6 pSubject(s): In: Chemical Engineering Vol. 112, no. 12 (nov. 2005) ; p. 40-45Summary: Acceptable capital-cost estimates for pilot plants can indeed be developed. But the pitfalls to be dodged are far more numerous than with estimates for full-scale plants.| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200038779 |
Acceptable capital-cost estimates for pilot plants can indeed be developed. But the pitfalls to be dodged are far more numerous than with estimates for full-scale plants.



