Image from Google Jackets

Understanding the challenges of nuclear new build

By: Publication details: sep. 2010Description: 4 p. ; 42-45 In: Power Engineering International 18Summary: Transcripción del resumen del autor. With nuclear power firmly back on the energy agenda, Arthur D. Little’s study looks at the challenges facing owners, particularly in the context of many projects being run on tight time schedules by teams with little or no experience of nuclear new build. Together with in-depth interviews with market participants, the study draws on over 150 projects currently under construction or planned, totalling 562 new reactor units.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200050644

Transcripción del resumen del autor. With nuclear power firmly back on the energy agenda, Arthur D. Little’s study looks at the challenges facing owners, particularly in the context of many projects being run on tight time schedules by teams with little or no experience of nuclear new build. Together with in-depth interviews with market participants, the study draws on over 150 projects currently under construction or planned, totalling 562 new reactor units.

8



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales