Image from Google Jackets

New concept offers construction alternative

Publication details: ene. 2009Description: 2 p. ; 65-66 In: E & P 82Summary: Strained yard capacity has led to innovation. A new approach to construction could be a viable option for building deepwater floaters, allowing construction to move ahead outside backlogged conventional yards.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200043870

Strained yard capacity has led to innovation. A new approach to construction could be a viable option for building deepwater floaters, allowing construction to move ahead outside backlogged conventional yards.

1



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales