TWENTY YEARS OF FPSO OPERATION IN THE NORTH SEA
Description: 8 pOnline resources: Summary: Petrojarl I started its operation in August 1986, as the first FPSO in the North Sea. It has since produced from 10 different fields. This paper presents the experience gained in developing, building and operating this FPSO in the North Sea. Particular challenges which are covered are: Vessel design and structural strength, turret, risers, mooring, production equipment, offloading, rules and regulations. The paper also covers experiences from constructing and operating subsequent FPSOs such as the Petrojarl Foinaven in the North Atlantic West of Shetland.| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca virtual | Not for loan | 200040938 |
Petrojarl I started its operation in August 1986, as the first FPSO in the North Sea. It has since produced from 10 different fields. This paper presents the experience gained in developing, building and operating this FPSO in the North Sea. Particular challenges which are covered are: Vessel design and structural strength, turret, risers, mooring, production equipment, offloading, rules and regulations. The paper also covers experiences from constructing and operating subsequent FPSOs such as the Petrojarl Foinaven in the North Atlantic West of Shetland.