Manage WPC to maximize reservoir deliverability
Description: 2 pSubject(s): In: Drilling Contractor Vol. 61, no. 4 (jul./agos. 2005) ; p. 59-61| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200037170 |
| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200037170 |