Image from Google Jackets

New ways to make wells work harder

By: Description: 1 p In: E & P Vol. 78, issue 2 (feb. 2005) ; p. 57Summary: Faster and cheaper well intervention was aim behind a campaign carried out by Statoil late 2004 working with a new subsea lubricator stack wich has made rigless workovers a reality.
Item type: Artículo de Revista
Holdings
Current library Status Barcode
Biblioteca Alejandro Angel Bulgheroni Not for loan 200035044

Faster and cheaper well intervention was aim behind a campaign carried out by Statoil late 2004 working with a new subsea lubricator stack wich has made rigless workovers a reality.



Instituto Argentino del Petróleo y del Gas
Maipú 639 (C1006ACG) – Buenos Aires – Argentina
Tel: (54 11) 5277 IAPG (4274)
Lu - Vie 11 a 17 hs
Mail: biblio@iapg.org.ar


Copyright © 2026, Instituto Argentino del Petróleo y del Gas, todos los derechos reservados.

Protección de datos personales