Steerable drilling needs minimal well interaction
Description: 3 p In: Drilling Contractor Vol. 60, no. 5 (sept./oct. 2004) ; p. 33-35| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200033351 |
| Current library | Status | Barcode | |
|---|---|---|---|
| Biblioteca Alejandro Angel Bulgheroni | Not for loan | 200033351 |